top of page
Search

Swinging into May

  • Writer: Jay R
    Jay R
  • May 15, 2019
  • 1 min read

As May gets underway, our church project is finished design and off to the contractors for pricing. It's always a bit of pins and needles waiting to hear back the final numbers - engineers always like to see things built and if the numbers come back unexpectedly high, odds are the job won't move forward.


Normally work a bit down south in Houston and the coast. In this case, a project that takes me further south than I've ever been in my life. Down to the Dominican Republic!


Sort out some pipes and valves

But it's not all work - a bay-side dinner with some wonderful people I'm working with.

 
 
 

Recent Posts

See All

Yorumlar


Subscribe

254.654.3641

©2021 by GTX Engineering. Proudly created with Wix.com

bottom of page