top of page
Search

Swinging into May

  • Writer: Jay R
    Jay R
  • May 15, 2019
  • 1 min read

As May gets underway, our church project is finished design and off to the contractors for pricing. It's always a bit of pins and needles waiting to hear back the final numbers - engineers always like to see things built and if the numbers come back unexpectedly high, odds are the job won't move forward.


Normally work a bit down south in Houston and the coast. In this case, a project that takes me further south than I've ever been in my life. Down to the Dominican Republic!


ree
Sort out some pipes and valves

ree
But it's not all work - a bay-side dinner with some wonderful people I'm working with.

 
 
 

Recent Posts

See All

Comments


Subscribe

254.654.3641

©2021 by GTX Engineering. Proudly created with Wix.com

bottom of page